Forecourt Excellence: Universal Innovations at Hass Petroleum Nanyuki

Client: Hass Petroleum Kenya
Location: Nanyuki, Kenya
Service Provider: Universal Innovations & Industrial Limited
Project Duration: 3 Months
Focus: External Works – Forecourt Reconstruction, Fuel Tank Casting & Terrazzo Installation

Project Overview

In the high-stakes world of petroleum infrastructure, safety, durability, and precision are non-negotiable. For this reason, Hass Petroleum Kenya partnered with Universal Innovations & Industrial Limited (UIIL) to upgrade its Nanyuki petrol station over a 3-month period.

This case study highlights the first of three major projects completed simultaneously by UIIL: the external reconstruction of the forecourt. The works included:

  • Full cabro block replacement

  • Reinforcement casting for underground fuel tanks

  • Terrazzo surfacing under the canopy area

These improvements were executed while strictly adhering to regulatory and environmental guidelines set by EPRA Kenya, OSHA Kenya, and NEMA.

Cabro Works: From Demolition to Completion

The existing cabro-paved forecourt had suffered wear and structural instability. UIIL’s mission was to reconstruct the surface fully, ensuring optimal drainage, safety, and fuel-resistance for long-term use.

Step-by-Step Cabro Reconstruction

Step 1

Site Assessment & Safety Setup

  • Evaluated slope, surface condition, and drainage challenges
  • Installed barricades and warning signage
  • Secured fuel systems to prevent accidental interference

Removal of Damaged Cabro & Base

  • Carefully removed all worn-out cabro blocks
  • Excavated compromised base materials to prevent future sinking
  • Followed proper waste disposal protocols as per NEMA Kenya

Sub-base Preparation

  • Laid and compacted hardcore and ballast layers using mechanical rollers
  • Ensured proper slope using laser levels for efficient water runoff

Bedding Sand Layer

  • Spread sharp river sand uniformly over the compacted sub-base
  • Screeded for a level, consistent bedding to support new cabro

Cabro Block Installation

  • Laid heavy-duty, interlocking cabro blocks suitable for vehicle loads

  • Used a herringbone pattern for maximum interlock and weight distribution

  • Installed concrete edge restraints to prevent lateral movement

Vibration & Joint Sealing

  • Vibrated surface with a plate compactor to ensure tight interlock
  • Swept fine jointing sand into gaps for extra surface stability

Final Touches

  • Cleaned the area, ran quality control checks, and ensured drainage flow

  • Handover was done following internal Q.A. and client satisfaction

UIIL followed cabro paving best practices outlined by the National Construction Authority of Kenya.

Company

Hass Petroleum 

Most Recent Posts

  • All Post
  • Building Design & Finishes
  • civil engineering in Kenya
  • Construction Insights & Tips
  • Construction Works in Kenya
  • Electrical Installations in Kenya
  • Fuel Infrastructure Projects
  • HVAC services in Kenya
  • Industrial & Corporate Construction
  • Industrial Fabrication & Welding

Explore Our Services

Universal Innovation & Industrial Ltd. delivers high-quality mechanical, civil, and electrical engineering solutions with a commitment to safety, innovation, and efficiency—explore our services to see how we can support your next project.

Fuel Tank Casting: Stability Where It Matters

Underground tanks require heavy-duty reinforcement to avoid surface depression or leakage risks.

UIIL:

  • Demarcated the tank area and prepared the slab framework

  • Installed steel reinforcement bars and formwork

  • Poured and cured concrete over the tank area using grade-compliant mixes

The outcome was a solid, spill-resistant foundation designed to last — and to comply with EPRA’s Petroleum Facility Construction Standards.

Terrazzo Surfacing: Under-the-Canopy Finish

Under the fuel dispensing area, UIIL opted for terrazzo surfacing due to its durability and clean finish.

The process involved:

  • Leveling and prepping the substrate

  • Applying a terrazzo mix resistant to fuel, oil, and frequent cleaning

  • Polishing and sealing for a glossy, non-slip finish

This surface provided both aesthetic value and functional safety for high-foot-traffic zones.

Compliance & Safety First

Throughout the project, UIIL maintained full compliance with:

Protocols included:

  • On-site PPE use

  • Noise and dust control

  • Controlled access during work phases

  • Structured waste disposal

Conclusion

This forecourt transformation stands as a testament to Universal Innovations & Industrial Limited’s capacity to manage complex civil projects with professionalism, safety, and technical expertise.

By completing this project alongside two others within the same timeframe, UIIL demonstrated:

  • High operational efficiency

  • Mastery of industrial flooring and fuel station upgrades

  • Adherence to Kenyan construction regulations

Universal Innovations & Industrial Limited delivers reliable, regulation-compliant infrastructure solutions for Kenya’s fuel and construction industries.

Scroll to Top